Amaranth/Grand Valley TWLN Bridge

Project Description:
Prefabricated retaining walls were the preferred option by the general contractor to expedite completion of this bridge closure. With a lot of flowing water in the area and time of year, this was an ideal solution for this project.
Project Location: |
Scope of Project: |
Project Install Date: |
Owner: |
Engineer: |
Contractor: |