Bullis Creek Drain & Pump Station

Project Description:
IECS took on the challenge of manufacturing this half a million pound chamber. it was cast into 10 pieces. The IECS design made for a quick and easy installation. Pouring this structure in place would have taken 3-4 weeks. With our pre-cast option, the contractor had it installed within one day.