Burlington Beach Outlet Modifications

Project Description:

This large Headwall was designed to take heavy wave impact on the North shoreline of Lake Ontario but also built segmentally in order for the contractor to be able to handle the pieces on site with their own equipment. Multiple connection methods were used including tongue & groove and dowelled cavities.

Project Location:
Burlington, Ontario

Scope of Project:
Modified (3 piece) 1500mm Headwall 3.7m x 2.4m x 1.5m thick

Project Install Date:
2015-10-01

Owner:
City of Burlington

Engineer:
Shoreplan Engineering Limited

Contractor:
Bronte Construction