Lely Manor Canal West Outfall / Main Canal

Project Description:
Cable Concrete® was specified to protect the banks with side slope stabilization and provided a maintenance road around the perimeter of the canal.
Project Location: |
Scope of Project: |
Project Install Date: |
Owner: |
Engineer: |
Contractor: |