King Road Reconstruction

Project Description:

Cable Concrete® was used to create an access road to a CN & Metrolinx Rail Road Line across an emergency overflow area. Strength and flexibility made Cable Concrete® an ideal solution.

Project Location:
Burlington

Scope of Project:
CC35 - 300 sqm

Project Install Date:
2014-09-01

Owner:
City of Burlington

Engineer:
Amec

Contractor:
Esposito Bros