Sewage Treatment Plant (Lagoon)

Project Description:

Cable Concrete® was used for bank stabilization around the perimeter of the pond of the sewage treatment plant. Prevention of erosion was necessary due to turbulent airatores.

Project Location:
Blenheim, Ontario

Scope of Project:
CC35 - 713.50 sqm

Project Install Date:
June, 1995

Owner:
Town of Blenheim

Engineer:
Todgham & case Associates

Contractor:
Bre-Ex Ltd.