Target Store Sitework

Project Description:

Cable Concrete® was used on an overflow to control the lakes elevation and provide an access roadway for all terrain vehicles.

Project Location:
Grand Rapids, Minnesota

Scope of Project:
CC35 97.55 sqm

Project Install Date:
July, 1994

Owner:
City of Grand Rapids

Engineer:
RCM & Associates

Contractor:
Casper Construction