2001 Phase 3 Trunk Storm Sewer

Project Description:
Major stormwater management project included construction of three large ponds. Cable Concrete® was specified for six roadways to allow equipment access to pond floors for removal of sedimentation. Roadways needed to remain durable through ongoing freeze-thaw events and subsequent ground movement. Cable Concrete® was also used for protection of the lowest pond’s overtopping crest.
Project Location: |
Scope of Project: |
Project Install Date: |
Owner: |
Engineer: |
Contractor: |