2001 Phase 3 Trunk Storm Sewer

Project Description:

Major stormwater management project included construction of three large ponds. Cable Concrete® was specified for six roadways to allow equipment access to pond floors for removal of sedimentation. Roadways needed to remain durable through ongoing freeze-thaw events and subsequent ground movement. Cable Concrete® was also used for protection of the lowest pond’s overtopping crest.

Project Location:
Minneapolis, Minnesota

Scope of Project:
CC45 - 2,155.4 sm

Project Install Date:
Fall 2001-Spring 2002

Owner:
Minneapolis Airport Commission

Engineer:
URS - BRW, Inc.

Contractor:
F.M. Frattalone Excavating & Grading