Project Description:
This channel leading into the Thames River was reconstructed with a new 2100mm Headwall Outlet. To protect the area, the CC45 Cable Concrete mats were specified with a combination of arrowhead anchors and a 2 block key-in around the perimeter of the channel. Cable Concrete is being used for erosion protection from the flows coming out of the headwall and the Thames River.