Cavendish Crescent Reconstruction

Project Description:

This channel leading into the Thames River was reconstructed with a new 2100mm Headwall Outlet. To protect the area, the CC45 Cable Concrete mats were specified with a combination of arrowhead anchors and a 2 block key-in around the perimeter of the channel. Cable Concrete is being used for erosion protection from the flows coming out of the headwall and the Thames River.

Project Location:
London, Ontario

Scope of Project:
CC45 - 749.7sm or 63 Pieces

Project Install Date:
2018-10-01

Owner:
City of London

Engineer:
Spriet Associates

Contractor:
Bre-Ex Construction