Forest Lawn Landfill

Project Description:

Landfill closure design required down drain channels to handle accumulated sheet flow from side berms. Riprap deemed unacceptable due to steep flows and high velocities. Channels will vegetate with Cable Concrete® be easily maintained and allow access up the slope for vehicles.

Project Location:
Three Oaks, Michigan

Scope of Project:
CC35 - 8881.5 sqm

Project Install Date:
2007 - 2010

Owner:
Republic Services

Engineer:
Corner Environmental Group, LLC

Contractor:
Ryan Incorporated Central, Fox Contractors, Roy Zenere Trucking & Excavating