Markwart Road Boat Launch

Project Description:

Upgrade project to the existing Markwart Road Boat Launch. Existing aging concrete was damaged and in need of major upgrading. CC45 Cable Concrete was utilized to provide a hard access ramp for recreational boat access on Shuswap Lake.

Project Location:
Sorrento, BC

Scope of Project:
CC45 - 178.5sm or 15 pieces

Project Install Date:
2017-10-03

Owner:
Columbia Shuswap Regional District

Engineer:
Gentech Engineering Inc.

Contractor:
Twin Valley Contracting Ltd.