Parry Bridge Rehabilitation

Project Description:

IECS was able to pour special 8′ x 5′ Cable Concrete mats and manufacture a lighter, more compact lifting bar to install these mats. A small excavator was able to handle the weight and freely manoeuver under the bridge to place the mats. This project really highlights IECS’ ability to adapt to specific project conditions to meet the needs of consultants and owners.

Project Location:
Chatham, ON

Scope of Project:
Modified CC45 - 501.65 sm

Project Install Date:
2016-11-01

Owner:
Municipality of Chatham-Kent

Engineer:
GM BluePlan Engineering

Contractor:
Facca Inc.