St. Lawrence Seaway Bank Stabilization

Project Description:
Cable Concrete CC45 provided the perfect solution for the St. Lawrence Seaway Management Corporation in portions of the 2:1 side slopes of their heavily used transport waterways. Along with ice jams carrying away loose rock rip-rap, freight vessels causing large waves had caused major erosion problems to the existing side bank.
Project Location: |
Scope of Project: |
Project Install Date: |
Owner: |
Engineer: |
Contractor: |