Streambank Stabilization Project

Project Description:
Highly erosive streambanks soils of David’s Creek were sloughing during high-water/high-flow events. Riprap was proven ineffective due to steep slopes. Cable Concrete® was chosen to protect the bank slopes and maintain water quality.
Project Location: |
Scope of Project: |
Project Install Date: |
Owner: |
Engineer: |
Contractor: |