Decew Falls Water Treatment Plant Spillway Rehabilitation

Project Description:
CC70’s were used to protect the bed of the spillway at the Decew Falls Water Treatment Plant. By utilizing our Cable Concrete Hydraulic Analysis Software the proper block thickness is chosen and provides four factors of safety ensuring the stability of your design. IECS can also offer design recommendations for items such as granular bedding, geogrids, geotextiles and anchoring methods.
Project Location: |
Scope of Project: |
Project Install Date: |
Owner: |
Engineer: |
Contractor: |