Herridge Reservoir

Project Description:

Cable Concrete was used as slope protection to this large bridge abutment on Eglinton Ave with the city of Toronto. Cable Concrete CC70 was installed on the access road and forebay of this pond basin. CC70 class blocks offered accessibility to the pond for maintenance sediment removal and ensured erosion protection at the inlet/outlet source during peak flow events.

Project Location:
Mississauga, ON

Scope of Project:
CC70 - 844.9sm or 71 pieces

Project Install Date:
2011-05-01

Owner:
Region of Peel

Engineer:
R.J. Burnside & Associates Ltd.

Contractor:
North America Construction Ltd. (NAC Constructors Ltd.)