Hickory Hills

Project Description:

A pooling area for a steep high flow channel was created using Cable Concrete®. this area dissipated the high velocity of water flow prior to entering a low flow creek. The channel was approximately a half a mile long, with bed slopes up to 30% and velocities of 8.5m/sec.

Project Location:
Tillsonburg, Ontario

Scope of Project:
CC70 - 331.66 sqm

Project Install Date:
October 1991

Owner:
Town of Tillsonburg

Engineer:
Cyril Demyre Engineering

Contractor:
Miracle Construction Ltd.