Long Tom Dam

Project Description:

A deteriorated dam was being reconstructed using a new design criteria. A former emergency spillway area was protected with riprap had failed numerous times prior to Cable Concrete® installation. This was allowing erosion and undermining of main chute. Cable Concrete® was specified for spillway and all surrounding areas.

Project Location:
Odessa, Minnesota

Scope of Project:
CC70 - 557.42 sqm

Project Install Date:
Fall, 1998

Owner:
Big Stone County

Engineer:
TKDA, St. Paul MN, Howard Midji

Contractor:
Hillman Bros. Construction