Long Tom Dam

Project Description:
A deteriorated dam was being reconstructed using a new design criteria. A former emergency spillway area was protected with riprap had failed numerous times prior to Cable Concrete® installation. This was allowing erosion and undermining of main chute. Cable Concrete® was specified for spillway and all surrounding areas.
Project Location: |
Scope of Project: |
Project Install Date: |
Owner: |
Engineer: |
Contractor: |