Stang Lake Wetland Restoration

Project Description:
Cable Concrete® specified to armor a newly constructed dike. Control structure and 60″ outlet pipe installed to recreate a wetland out of acreage currently being farmed.
Project Location: |
Scope of Project: |
Project Install Date: |
Owner: |
Engineer: |
Contractor: |