Beardy's and Okemasis First Nations Drainage Works Project

Project Description:

Cable Concrete G2 was utilized to line, protect and allow access to various overflow weir crossings incorporated into a road surface. The mats will allow vehicles to access the crossing while protecting the sub base from erosion during runoff and flow events.

Project Location:
Duck Lake, SK

Scope of Project:
CCG2 - 550.56sm or 37 Pieces

Project Install Date:
2018-01-01

Owner:
Beardy's and Okemasis First Nation

Engineer:
SAL Engineering

Contractor:
Mocon Construction Ltd.