Campbell River Waste Management Centre

Project Description:

Upgrade works to the existing waste management center. The facility in planning a closure in the next 3-5 years and preliminary works involved a SWMF and adjoining erosion control works. Cable Concrete G2 was utilized in lining a high flow spillway into the pond area, outlet protection at the discharging headwalls, and lining of the forebay berm between ponds.

Project Location:
Campbell River, B.C.

Scope of Project:
CCG2 - 848.16 m² or 57 Pieces

Project Install Date:
January 2019

Owner:
Comox Valley Regional District

Engineer:
GHD – Richmond, B.C.

Contractor:
Berry & Vale Contracting Ltd