Chinook Golf Course Bridge Crossing

Project Description:
Water runoff crosses over the access road nearly every year during spring runoff north of bridge where road elevations are lower than the bridge deck. Water periodically (5-10 years) runs over the wood deck of the structure during high flows and makes the Hole #1 green an island Northwest of the site. Cable Concrete G2 was installed at armor the subgrade during overflow events but also provide a solid accessible roadway for various golf course vehicles. |