Facultative Lagoon Facility

Project Description:

Cable Concrete CCG2 was designed and utilized in the Town of Langham’s newly constructed Facultative Lagoon facility at various oulet structure for energy dissipation and control of outflowing water, as well as erosion protection at the outlet aprons.

Project Location:
Langham, SK

Scope of Project:
CCG2 - 1279.69sqm or 86 Pieces

Project Install Date:

Owner:
Town of Langham

Engineer:
Associated Engineering

Contractor:
Nemanishing Contracting Ltd.