Hwy #6 Grade Raise

Project Description:
Rising water levels from the adjacent Quill Lakes water bodies continue to cause severe erosion alongside major sections of Hwy #6. The roadway was raised up to 2m in certain areas and the newly constructed roadside banks were lined with Cable Concrete G2 to protect.
Project Location: |
Scope of Project: |
Project Install Date: |
Owner: |
Engineer: |
Contractor: |