Hwy #8-05 Culvert Repair

Project Description:
Existing site conditions suffered severe erosion and washout damage. Cable Concrete G2 was installed at the twin culvert outlets to protect against further erosion during high flow periods.
Project Location: |
Scope of Project: |
Project Install Date: |
Owner: |
Engineer: |
Contractor: |