Lamont Creek Culvert

Project Description:

CCG2 mats were installed to provide erosion protection along steep sections of this drainage ditch. Steeper bed slopes resulted in higher velocity to the run off flows. The CCG2 mats are paired with a recycled TRM underlay and are secured together via stainless steel cable clamps and provide the right amount of protection.

Project Location:
Lamont County, AB

Scope of Project:
CCG2 - 184sm or 15 pieces

Project Install Date:
2018-07-01

Owner:
Lamont County

Engineer:
MPA Engineering Ltd.

Contractor:
Give Back Contracting