Dunsire Estates - Mount Pleasant

Project Description:
This large overflow weir structure was built segmentally in 6 wall panels and 4 footings with a total length of 18m. The size / lifting capabilities of the contractors excavator was considered during the design stage keeping the heaviest piece under 25,000lbs.