Echo Valley Provincial Park

Project Description:
Existing asphalt pathways and access roads had been washed out and eroded from high-water levels and wave damage. The Parks, Culture & Sports department turned to IECS and Cable Concrete to provide a permanent solution. CCG2 was utilized in areas along the Echo & Pasqua Beaches to serve as hard armoured access lanes and provide erosion protection during high-water and wave periods.
Project Location: |
Scope of Project: |
Project Install Date: |
Owner: |
Engineer: |
Contractor: |