IECS shows it versatility once again with this “Precast Baffle Wall” for the City of Toronto’s remediation of Emery Creek. This unique design was initially specified cast-in-place by the project engineer WSP. The wall was built segmentally with multiple panels and footings to be reconnected on site considering Clearway Construction’s lifting capabilities.