German Mills Creek Pipe Protection

Project Description:

This 650mm Enbridge Gas Pipeline runs perpendicular to three very large stormwater pipe outfalls (4800x3800mm, 1200mm, 4800x3800mm) Over time, the cover above this main gas line was eroded and exposed to damage from rock, debris or any other potential type of tampering. Cable Concrete CC70 was used to protect and anchor the pipeline with minimal site prep. Stainless steel cables, cable clamps and earth anchors provide long lasting stability.

Project Location:
Markham, ON

Scope of Project:
CC70 - 119sqm or 10 Pieces

Project Install Date:
2018-07-01

Owner:
Enbridge Gas Distribution

Engineer:
Stantec

Contractor:
R&M Construction