Girard Creek Low Water Crossing

Project Description:
Rising water levels in Southern Saskatchewan have caused overtopping of the rural road at the Girard Creek Crossing. Cable Concrete was incorporated into the remediation design for the RM of Hart Butte No. 11 – CC45 Cable Concrete was applied to line the banks on both sides of the road banks as well as protect the road top to provide one consistent protective layer to prevent erosion and washout during overtopping events.