Gleeson Line Bridge over McDougall Drain

Project Description:

IECS Group Provided Clarke construction with the pre-cast open bottom culvert and LG Block Retaining Wall system. IECS is a leader is specialty sizes and designs of box culverts and open bottom culverts

Project Location:
Chatham-Kent

Scope of Project:
8000mm x 4000mm Open Bottom Culvert & LG Block Wall

Project Install Date:
February 2020

Owner:
Municipality of Chatham-Kent

Engineer:
Stantec Engineering (Windsor)

Contractor:
Clarke Construction