GO Transit - Landsdowne Metrolinx Bridge Rehabilitation

Project Description:

IECS is quickly becoming an industry leader when it comes to precast solutions / specialty precast items associated with not only stormwater management projects but also any challenges encountered across the civil construction industry. This project was a rehabilitation of the Lansdowne Metrolinx Bridge for GO Transit. IECS manufactured custom Precast Ballast Walls and Distribution Slabs including over 130 – 25mm dowels fitting into conjoining 60mm pockets for the general contractor EllisDon. Due to the high demand of this rail line, an extremely tight schedule was in order and IECS delivered precision work ensuring no delays during installation.

Project Location:
Toronto, Ontario

Scope of Project:
6 Precast Ballast Walls (5.6m long x 1.9m high x 1.2m wide) & 6 Distribution Slabs (5.6m long x 5.5m wide)

Project Install Date:
2016-04-01

Owner:
Metrolinx

Engineer:
Amec Foster Wheeler

Contractor:
EllisDon