Halton Hills Village

Project Description:
When executing construction in sensitive areas, pre-cast offers many advantages such as working time spent in the given area and also sediment control issues can be dramatically decreased. This pre-cast 2400 x 1200mm Box Culvert Headwall measures at an impressive 22m long and arrived to the jobsite in 10 pieces (6 wall panels and 4 footings).
Project Location: |
Scope of Project: |
Project Install Date: |
Owner: |
Engineer: |
Contractor: |