Kitimat South Landfill Closure

Project Description:

The South channel was formed and lined with a bituminous geomembrane (BGM) product in 2013. This channel has been left exposed since construction to observe its performance. Channel protection is required to protect the BGM from environmental conditions (temperature fluctuations and sunlight) and to manage runoff anticipated with the installation of the upper landfill cover in 2017.

Project Location:
Kitimat, British Columbia

Scope of Project:
CC35 - 428.4 sqm or 36 Pieces

Project Install Date:
2016-09-01

Owner:
Rio Tinto Alcan

Engineer:
SNC Lavalin

Contractor:
Daudet Creek Contracting Ltd.