MTO 2015-3009 (Hwy 26)

Project Description:
A new 2400×2100 Concrete Box Culvert complete with wing walls was required with an open cut installation crossing Highway #26 along Georgian Bay in mid-summer. A fully precasted system allowed for an extremely efficient schedule reopening the highway for commuters in this beautiful part of the province.
Project Location: |
Scope of Project: |
Project Install Date: |
Owner: |
Engineer: |
Contractor: |