Central Park Subdivision

Project Description:
IECS manufactured 3 modified precast manholes to the Central Park Subdivision project in the rapidly growing area of Stoney Creek, Ontario. These structures were custom built and shipped with appropriate MTO permits due to the very large dimensions required to accommodate the large pipes and box culverts (4.9m x 5.5m x 2.8m). IECS offers complete structural design/engineering/manufacturing of the unique challenges that every project may present.
Project Location: |
Scope of Project: |
Project Install Date: |
Owner: |
Engineer: |
Contractor: |