Reconstruction of Neyagawa Boulevard

Project Description:
Precast keyway footings were utilized by the contractor vs. traditional poured-in-place methods to minimize curing time, shoring and dewatering, ultimately reopening the road to the public in the most time effective manner.
Project Location: |
Scope of Project: |
Project Install Date: |
Owner: |
Engineer: |
Contractor: |