Via Moto Subdivision

Project Description:

This open bottom culvert was a design build project IECS completed early in 2019. The culvert consisted of 24 sections with an average section length of 1.7m. IECS also designed and manufactured the culvert footings and large headwalls & wingwalls (10m long) on both ends of the culvert.

Project Location:
Nobleton, Ontario

Scope of Project:
Open Bottom Precast Culvert 5.5m x 1.65m x 41.5m

Project Install Date:
2019-03-01

Owner:
Fandor Homes

Engineer:
Cole Engineering/IECS

Contractor:
CDC Contraction